Free Change Order Template

Free Change Order Template

This free change order template works online: fill it in below and download a signature-ready PDF. No signup. It references the original estimate or contract, lists the added work line by line, and shows the original contract amount, the change amount and the new contract total, with signature lines for you and the client. Your documents save in your own browser, not on our servers.

A change order is the document that stops “while you’re here, can you also…” from turning into free work. It turns a verbal request into a written, priced and signed amendment to the contract. This change order form is built for general contractors, remodelers and every trade that has to price extra work in the middle of a job.

Tip: on a phone, use “Preview” in the tool to see the finished change order, then “Download PDF” and choose “Save as PDF”. Pick your trade at the top of the tool to load that trade’s line items.

What to Include in a Change Order Template

A complete change order identifies the original contract, describes exactly what changes and why, prices the change line by line, states any schedule impact, shows the original total, the change amount and the new total, and is signed and dated by both parties before the extra work starts. Check yours against this list:

  • Change order number (CO-1, CO-2…) and date
  • Original estimate or contract number, and the original contract amount
  • Job site address and client name
  • A plain-language description of the added, removed or substituted work
  • The reason: client request, hidden condition, design or code change
  • Line items for labor, materials, equipment and subcontractors
  • Overhead and profit on the change, and sales tax on taxable lines
  • Schedule impact: days added, or “no change to completion date”
  • When the change is billed: with the next progress payment, on completion, or up front
  • Signature and date lines for the client and the contractor

How Does the Change Order Calculate the New Contract Total?

Enter the original contract amount and price the change. The template adds overhead and profit and sales tax to the change, shows the result as the change amount, and adds it to the original amount to show the new contract total. If earlier change orders were approved, enter the current contract amount (original plus prior changes) so the running total stays right.

Line on the change orderWhere it comes from
Original contractThe amount you enter under “Original contract amount”
SubtotalThe sum of the change’s line items (quantity times rate)
Overhead and profitYour percentage, applied to the subtotal
Sales taxYour rate, applied only to lines you mark taxable
Change amountSubtotal plus overhead and profit, less any discount, plus tax
New contract totalOriginal contract plus the change amount

For the pricing method behind the change itself (labor, materials, markup and time), see how to write and price a change order.

Sample Change Order Line Items

These are common lines contractors add to a change order. Prices are left blank on purpose: rates vary by region, job and business, so enter your own.

Line itemTypeTypical unit
Additional framing laborLaborhr
Subfloor replacement (hidden damage)Materialsheet
Upgraded fixture, over allowanceMaterialeach
Added electrical circuit (subcontractor)Subcontractorjob
Extra dumpster haulEquipmenteach
Permit revision feeOthereach

How to Fill In This Change Order Form

  1. Add your business details once. Name, contact details, license number and logo are remembered for every future document.
  2. Reference the original contract. Enter the original estimate or contract number and the original contract amount.
  3. Describe the change. Use “Scope / notes” for what changes, why, and the schedule impact in days.
  4. Price the added work. Add line items with your quantities and rates, then overhead and profit and tax.
  5. Download, sign, then start. Choose “Download PDF”, get both signatures, and only then begin the extra work.

If the job was priced in this tool, open the original from “My documents” so the numbers match. Starting a new job? Use the construction estimate template, and when the work is done, bill it with the contractor invoice template. On longer jobs billed in stages, approved changes also go onto your schedule of values; progress billing explains how.

Tips for Change Orders That Get Signed

No signature, no start.

Make it a rule, and put it in the terms of your original estimate. For a true emergency, send the written change order the same day.

Price the time, not just the materials.

Extra trips, re-mobilization and schedule delay cost money. Add them as their own labor or equipment lines.

Number every change order.

A simple sequence (CO-1, CO-2) and a running contract total make the final invoice easy to check.

Write what was removed, too.

When the client drops work, enter it as a line with a negative price (for example −500) and the change amount and new contract total go down; describe it in the scope notes too, so nobody expects it later. Whether credits must be shown a specific way depends on your contract and state.

Want to Send Change Orders for E-Signature?

Today you download the PDF and send it yourself. Sending, client e-signature and online payments are planned for GuestMargin Pro, which is not available yet. Join the Pro waitlist and we will email you when it opens. If you need sending and payments now, compare contractor invoicing software that includes them.

Frequently Asked Questions

What is a change order template?

It is a pre-built form for documenting a change to a construction contract: what work is added or removed, why, what it costs, the schedule impact, and the new contract total, with signature lines. This one fills in online and downloads as a PDF.

Does a change order need to be signed?

Getting both signatures before the work starts is the safest practice, and some states require written, signed change orders for certain contracts, such as home improvement work. The rules depend on your state and your contract, so check them; this is not legal advice.

How do I price a change order?

Price it like a small estimate: labor hours at your burdened rate, materials, equipment and subcontractors, plus overhead and profit and any sales tax. Include the cost of extra trips and schedule delay, not only the materials.

What is the difference between a change order and a new estimate?

A change order amends an existing signed contract and shows the original amount, the change and the new total. A new estimate prices separate work that is not part of the current contract.

Is this change order template free?

Yes. No signup, and your documents save in your own browser. You can download a PDF, open past documents from “My documents”, and back everything up to a file.